Neolith® HC System

Hidden Fixing with Longitudinal Adhesion

This option developed for Neolith® cladding, consists of a hidden support system using chemical elastic longitudinal fi xation mounting on vertically “T”-shaped or “L”-shaped profi les, depending on whether the profi les match the joints between Neolith® slabs or if they are reinforcing the center of the joint and supporting the bearing through retention or sustentation brackets.

The whole system has been tested in certifi ed laboratories for such facts, and the results having been found satisfactory for the use of Neolith and can be found later on in this catalogue.

GENERAL SPECS


Minimum Joint Requirements
– 1/8″

Standard Air Flow Gap between back of panel and exterior insulation – Standard Air Gap 4”

Maximum Wind Load vs Panel size vs Support spacing – ind Load 3000Pa vs 142”x48” vs Vertical Supp. 24”

HC System vertical section

  1. Thermal Insulation
  2. ESC aluminum 100x65x60x3
  3. Vertical aluminum profi le “T 100x50x2”
  4. Adhesive PanelTack-HM
  5. Double side tape adhesive
  6. Neolith® Slab

HC System vertical section

  1. Thermal Insulation
  2. ESC aluminum 100x65x60x3
  3. Vertical aluminum profi le “T 100x50x2”
  4. Adhesive PanelTack-HM
  5. Double side tape adhesive
  6. Neolith® Slab

HC System Installation Steps

Substructure distribution and installation:

Dimensions of the perpendicular substructure depends on the façade construction. The distances between the substructure battens and their width are determined by the load requirements and by the type of panel used.

Application method:

Clean the surface with a clean, grease and fl uff free cellulose cloth or cleaning paper soaked, wiping the surface in one direction only (dirty cloths must be replaced). 

Apply one thin coat of primer uniformly all over the surface with a brush or felt pad. Allow a fl ash off time of at least 30 minutes. The back Neolith surface to be bonded must be clean, dry and free from grease.

Bonding-tape application:

Apply Double Side Tape over the whole length of the vertical sections and parallel to the edges.

Do not pull off the protective foil at this time.

Apply Structural Adhesive in a triangular bead by using the triangular nozzle supplied (width 8 mm, height 10 mm) with at least 5 mm gap to the fi xing tape and to the side of the batten.

Neolith® slab placing:

Remove the protective foil on the Double Side Tape. Place the cladding panel in the required position on the adhesive bead without the panel touching the fixing tape. To simplify mounting, the panels should be carefully designed. Position the panels precisely and press them firmly until they contact the Structural Adhesive Panel fixing tape.

Downloads

HC System Technical Guide

VM System Technical Guide

Strongfix System Technical Guide